Network Working Group B. Cosell
Request for Comments #218 BBN
NIC #7548 8 September 1971
Categories: B.1
Updates: none
Obsoletes: none
To help us expand our role as NCC, we will be changing the
status reporting facility of the IMP. The change will take place
within the next month and should be transparent to the hosts.
The text status reports will be removed. They have already
been completely superseded by a binary version sent directly to
the NCC and are now just excess baggage.
The status reports will remain with the statistics program
on fake host 3, but will no longer be affected by any of the
PARAMETER CHANGE parameters. This will prevent the Hosts from
inadvertently interfering with the operation of the NCC.
BC/jm
[ This RFCwas put into machine readable form for entry ]
[ into the online RFCarchives by BBN Corp. under the ]
[ direction of Alex McKenzie. 12/96 ]
文章来源于领测软件测试网 https://www.ltesting.net/
版权所有(C) 2003-2010 TestAge(领测软件测试网)|领测国际科技(北京)有限公司|软件测试工程师培训网 All Rights Reserved
北京市海淀区中关村南大街9号北京理工科技大厦1402室 京ICP备10010545号-5
技术支持和业务联系:info@testage.com.cn 电话:010-51297073










